Remove liquid hydrocarbon, water, sand and pipe scale in the gas of the pressure regulating measuring station;
Install before the gas storage tank to prevent particles and moisture from entering;
Installed in the suction end of the compressor to prevent particles and moisture in the air stream from wearing the equipment;
Remove particulate matter and moisture from gas treatment equipment to prevent fouling process equipment and catalyst poisoning;
Installed downstream of mixers such as amines, glycols, potassium and absorption oils for recycling to reduce dissolution losses.
Add: No.22 Yanhe Middle Road, Xinbei District, Changzhou City, Jiangsu Province
Tel: 0519-68951000
Fax: 0519-68951800
E-mail: terrencemarket@terrence.com.cn
Website: http://www.terrence.com.cn